Home Up NBSR CL Chain of Lakes Sunrise River

Total Maximum Daily Load

A Total Maximum Daily Load is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards and an allocation of that amount to the pollutants source.  TMDLs are required by the US Environmental Protection Agency.  Draft load reduction (amount of pollutant that needs to be removed to meet standards) will be available for each impaired lake by the TMDL meetings.  The Draft TMDL is scheduled to be completed by January 2012.

TMDL Lake Summary Sheets

North Center Lake            South Center Lake            Lake Emily           

Linn Lake            Little Lake            Ogren Lake

Pioneer Lake        School Lake        Wallmark Lake

 

Protection Lake Summary Sheets

Chisago Lake        Lake Ellen    Green Lake        Little Green Lake  

 Kroon Lake        North Lindstrom Lake        South Lindstrom Lake

 

Lake Martha        Mattson Lake        Spider Lake

 

 

For more information please contact the Chisago SWCD at 651/674-2333 or casey.thiel@mn.nacdnet.net

 

 

 

38814 Third Avenue ~ North Branch, MN 55056 ~ 651/674-2333

 

E-Mail ~ susan.humble@mn.nacdnet.net