Home Up NBSR CL Chain of Lakes Sunrise River

Total Maximum Daily Load

A Total Maximum Daily Load is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards and an allocation of that amount to the pollutants source.  TMDLs are required by the US Environmental Protection Agency.  Draft load reduction (amount of pollutant that needs to be removed to meet standards) will be available for each impaired lake by the TMDL meetings.  The Draft TMDL is scheduled to be completed by January 2012.

Lake Summary Sheets

North Center Lake            South Center Lake            Lake Emily            Kroon Lake

Linn Lake            Little Lake            Ogren's Lake

Pioneer Lake        School Lake        Wallmark Lake

 

For more information please contact the Chisago SWCD at 651/674-2333 or casey.thiel@mn.nacdnet.net

 

 

 

Chisago SWCD, 38814  Third Avenue, North Branch, MN 55056

651/674-2333 Fax 651/674-8828

E-Mail us a question

 


 

Questions or problems regarding this web site should be directed to susan.humble@mn.nacdnet.net

Copyright © 2002 Chisago SWCD. All rights reserved.
Last modified: 08/03/10.